Wall of Time
Location: Djerba, Tunisia
Project Duration: 2019
Surface Area: 2 sqm
Status: Completed
Project Summary
We start by collecting material in and around the site of our intervention. Between two wooden formworks the wall is mounted layer by layer.
The layers are compacted by hand by simple ramming. The wall is left abandoned in the lagoon, it will suffer all possible and imaginable attacks, the air saturated with salt and humidity, the wind, the rain, the extreme sunshine, etc.
Every year I visit the wall, like a pilgrimage, to hear about it, see its condition, follow its deterioration. (Sometimes even passing friends send me photos). He is there, and he has resisted for 4 years, for how long, we do not yet know.
But what is certain is that his resistance will be a real rant against the construction industry. A natural material, collected on site, deployed with simple means and which can be an ecological and responsible alternative.
The wall will crumble until it reaches the ground, in the meantime, we are still visiting it.
the installation is collaborative work between Handover Egypt, Hasni & Hasni architects and the H2TEAM with both egyptian and tunisian architecture students.
TEAM MEMBERS
Ahmed Abd Elgawad Refay
Mohamed A. Tantawy
Amin Hasni
Marina Michel
Hayba Kawther Alimi
Merna Wael
Toka Hassan
Mariam Mohsen Noureldin
Sara Arafa
Norhene Hamdi
Mahdi Feki
Syrine Bel Fetni
Manel Ksaier
Ghada Ziada
Ghassen Bouabid
Ghada Boukriss
Salma Dhouib
Rania Mnif
Yassine Lassoued
Souhir Soltani
Lamis Amamou
Aladine Nefzi
Allrights reserved – Hasni and Hasni Architects 2024